Question No: 31 – (Topic 1)

Refer to the exhibit.

Ensurepass 2018 PDF and VCE

Your application has a reduced health score. Upon inspection, you find a fault that impacts the health score. The fault currently is in the soaking lifecycle state. Which two options are possible next steps while in this state? (Choose two.)

  1. The condition ceases by itself and automatically clears the fault.

  2. The soaking timer expires and moves to the Raised severity level.

  3. Acknowledge the fault, which immediately clears it from the system.

  4. The condition ceases by itself and goes into the soaking-clearing state.

Answer: B,D

Question No: 32 – (Topic 1)

While doing service insertion with vASA with route peering, which two parts must be configured? (Choose two.)

  1. The path for interfaces must be specified when the L4-L7 device is created.

  2. The route peering profile must be specified when the L4-L7 Service Graph template is created.

  3. The VM name must be specified when the L4-L7 device is created.

  4. The chassis must be specified when the L4-L7 device is created.

Answer: A,B

Question No: 33 – (Topic 1)

Refer to the exhibit.

Ensurepass 2018 PDF and VCE

Which network script automation option or tool is used in the exhibit?

  1. REST

  2. Bash script

  3. NETCONF

  4. Cisco EEM

  5. Python

Answer: E

Question No: 34 – (Topic 1)

Which three options are benefits of the vPC peer switch feature? (Choose three?)

  1. After the peer link comes up, it performs an ARP bulk sync over CFSoE to the peer switch.

  2. It improves convergence for Layer 3 flows.

  3. It allows a pair of vPC peer devices to appear as a single STP root in the Layer 2.

  4. It eliminates the recommendation to pin the STP root to the vPC primary switch.

  5. It simplifies STP configuration by configuring both vPCs with the same STP priority.

Answer: C,D,E

Question No: 35 DRAG DROP – (Topic 1)

Drag and drop the feature from the left onto the correct benefit on the right.

Ensurepass 2018 PDF and VCE

Answer:

Ensurepass 2018 PDF and VCE

Explanation: Congestion Notification IEEE 802.1 Qau

Data center Bridging Exchange DCBX

Priority-Based Flow Control IEEE 802.1 Qbb

Enhanced transmission selection IEEE 802.1 Qaz

Question No: 36 – (Topic 1)

Which two statements about Cisco UCS Director workflow are true? (Choose two.)

  1. You arrange tasks in sequence and define inputs and outputs to those tasks. Outputs from earlier tasks are available to use as inputs to any subsequent task.

  2. Looping and conditional branching cannot be implemented.

  3. Each task in workflow designer is built using Python script.

  4. You build workflows using a drag-and-drop user interface called workflow designer.

Answer: A,D

Question No: 37 – (Topic 1)

How do you preprovision a Cisco UCS chassis?

  1. Associate service profiles to each slot.

  2. Associate a service profile template to the chassis.

  3. Select preprovision from the general menu of the chassis.

  4. Configure server pool policies for the chassis

Answer: A

Question No: 38 – (Topic 1)

Which two statements about NFS Appliance port failover and network uplink failure on Cisco UCS are true? (Choose two.)

  1. To change default appliance port behavior, configure an appliance port failover policy and set the action to be taken upon uplink failure.

  2. Failover must be configured on the storage side and Cisco UCS side, and it must be implemented with the correct network design while specified failover behaviors for storage controllers are kept in mind.

  3. By design, Cisco UCS fabric interconnects operate as one large fabric.

  4. Failover cannot be configured on the Cisco UCS side for appliance ports.

  5. By default, appliance ports are shut down if the uplink that they are pinned to goes down.

Answer: A,D

Question No: 39 – (Topic 1)

Refer to the exhibit.

Ensurepass 2018 PDF and VCE

After you deploy a service profile from a template, you encounter these two errors. Which action is needed to resolve this issue?

  1. Install an operating system.

  2. Reassociate the service profile.

  3. Associate a vNIC template to the service profile template.

  4. Reset the server in the server General subtab.

  5. Remove the server from maintenance mode.

Answer: A

Question No: 40 – (Topic 1)

Refer re the exhibit.

Ensurepass 2018 PDF and VCE

When utilizing the Cisco Application Virtual Switch in an ACI fabric, it can be deployed in two types of switching modes. Which two types of encapsulations can be used in each mode? (Choose two.)

  1. Local Switching VLAN

  2. Local Switching VLAN or VXLAN

  3. Local Switching VXLAN

  4. No Local Switching VLAN

  5. No Local switching VXLAN

  6. No Local switching VLAN or VXLAN

Answer: B,E

100% Ensurepass Free Download!
400-151 PDF
100% Ensurepass Free Guaranteed!
400-151 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.